Ongoing Projects

Tawau Airport Project
Design and build basis, including preliminaries, design, construction of terminal buildings, and associated works.

Pan-Borneo Highway Construction – WP26
Constuction of a 18.0km dual carriage highway from Sukau to Kampung Lot. M, Sabah, Including the construction of 2 interchanges and 1 bridge.

Pan-Borneo Highway Construction – WP13
Construction of a 21.2km dual carriage highway from Temuno to Bingolon, Sabah, including the construction of 3 bridges.

Pan-Borneo Highway Construction – WP12
Construction of a 14.8km dual carriage highway from Sarang to Temuno, Sabah, including the construction of 4 bridges.

Pan-Borneo Highway Construction – WP06
Construction of a 21.74km highway from Putatan to Inanam, Kota Kinabalu, including the construction of 6 interchanges and 3 bridges.

Jalan UMS and Jalan Sepanggar Road Works
Road infrastructure modifications on Jalan UMS and Jalan Sepanggar, Kota Kinabalu. Scope includes roadway improvements and construction of four flyovers along the route.

Jalan Lintas Road Works
Road infrastructure modifications on Jalan Lintas, Kota Kinabalu. Scope includes roadway improvements and construction of three flyovers along the route.

Jalan Lintas Sewerage System Modification
Relocation of a sewerage pipe along Jalan Lintas in Kota Kinabalu.

Pulau Sebatik Road Development
Design and construction of a 7.6 km road connecting Kampung Sungai Pukul to Kampung Sungai Bergosong in Sebatik, Tawau.

Kota Belud Road Improvement Works
Road upgrade works on the route from Jalan Tengkurus Lahanas Siba to Lahanas Sokib in Kota Belud.
Completed Projects
Our Group proudly served as the sole primary contractor for all the major construction projects mentioned below. For information on our other past projects, please refer to Investor Relations.

Kolam, Wawasan, and Karamunsing Interchange Development
Construction of three flyovers at Kolam, Wawasan, and Karamunsing interchanges. Includes road improvements on Jalan Nenas, Karamunsing.

Sitompok Interlinking Bridge Construction
Design and construction of a pre-stressed vehicular bridge over Sungai Sitompok, connecting Binsuluk and Kuala Penyu in Sabah.

Sepanggar Twin Tunnel Construction
Development of a twin tunnel system with dual carriageway, reducing travel distance by 11 kilometers. Located in the Sepanggar region.

Jalan Lintas Road and Interchange Expansion
Road widening from 2 to 3 lanes on Jalan Lintas, Kota Kinabalu, including construction of 2 interchanges.