Flyover Jalan Lintas/Jalan Kolam
Construction of Flyover at Junction over Jalan Lintas/ Jalan Kolam (J7).
The construction of two main junctions is necessary to provide a smooth, efficient and safe flow with minimum interruptions in the area.
Client: Jabatan Kerja Raya
Contract Value: RM220 million
Duration: In a timespan 2 years (Year 2015-2017)

Flyover Jalan Lintas/Jalan Tuaran
Construction of Flyover at Junction over Jalan Lintas/ Jalan Tuaran (J8).
The construction of two main junctions is necessary to provide a smooth, efficient and safe flow with minimum interruptions in the area.
Client: Jabatan Kerja Raya
Contract Value: RM220 million
Duration: In a timespan 2 years (Year 2015-2017)

Flyover Karamunsing (Phase I – Karamunsing)
Pembinaan Persimpaggan Bertingkat Karamunsing, Kota Kinabalu.
Client: Jabatan Kerja Raya
Contract Value: RM142.346mil
Duration: 79 months (September 2001 – April 2008)

Flyover Karamunsing (Phase II – Sadong Jaya)
Pembinaan Persimpaggan Bertingkat Karamunsing, Kota Kinabalu.
Client: Jabatan Kerja Raya
Contract Value: RM142.346mil
Duration: 79 months (September 2001 – April 2008)

Flyover Karamunsing (Phase III – Wawasan)
Pembinaan Persimpaggan Bertingkat Karamunsing, Kota Kinabalu.
Client: Jabatan Kerja Raya
Contract Value: RM142.346mil
Duration: 79 months (September 2001 – April 2008)

UiTM Dual Carriageway Tunnel
Pembinaan Jalan Dua Hala Dari UiTM Ke Sepanggar Bay Continer Terminal (3KM), Kota Kinabalu, Sabah.
Client: Jabatan Kerja Raya
Contract Value: RM66.21mil

Jalan Sibuga
Project Membina Jalan Lintas Sibuga, Sandakan, Sabah.
Client: Jabatan Kerja Raya
Contract Value: RM50.107mil
Duration: 30 Months (February 2000 – August 2002)

Jalan Ranau – Tamparuli
Perbaikan Cerun in Jalan Ranau – Tamparuli KM 45.3 dan KM 45.9, Sabah.
Client: Jabatan Kerja Raya
Contract Value: RM12.128mil
Duration: 14 Months (December 95 – February 97)